Welcome to Colonial Parking.....
x close
open ticker

PNC Bank Center Garage

The PNC Bank Center began with a ten-year Colonial project assembling the ownership of the land on which the building was developed. After successfully managing the property as a surface parking lot, Colonial assembled the team to develop the Class “A” office building with integrated parking garage that was completed in 1985.

The PNC Bank Center began with a ten-year Colonial project assembling the ownership of the land on which the building was developed. After successfully managing the property as a surface parking lot, Colonial assembled the team to develop the Class “A” office building with integrated parking garage that was completed in 1985.